Openreach

Local Loop Unbundling (LLU) - Co-Location (Hostel) Product Information


Demand Management for Co-location services (Bow Wave Process)

By industry agreement , "Demand Management for Co-location services (Bow Wave Process)" has been suspended.
LLU forecasting and Order Placement process have matured and is now managed by self regulation. BT will be accepting forecasts, requests and orders for Local Loop Unbundling services using the processes on this web-site. Forms for submitting the forecasts and the forecast and order management guidelines can be obtained from the Forecasting Forms and Guidance pages of this site. The Weekly Order Forms are below :

 


Co-Location (Hostel) Product Descriptions

Hostel Product Description Hostel Product Description
Mini Hostel Product Description Mini Hostel Product Description
ASS600 Product Description
ASS600 Product Description

Co-Location Weekly Order Forms (WOFs)

Co-Location WOF Template and Annex

These forms are to be used to order Plan And Build Surveys for Co-Locations, using the processes outlined in the Industry agreed Process Manual

DL WOF Template

Annex

PCR3 Template (Carrier Price List Reference Notes)

PCR3 Template

Co-Location Ordering Process

This section provides the High Level Processes for ordering the Plan and Build of Physical Co-Locations for Local Loop Unbundling.

 

Co-Location Order Process Manual
Note: The text in Section 3.1 of this document is due for update in line with LLU Forecast Forms & Plan & Build Forecast and Order Management Guide

Collocation Order Process Manual

Co-Mingling Additional Tie Cable Request Form

Comingling Tie Cable Request Form

Additional Fabric Items Request Form Fabric Items Request Form 

Co-Location Specifications

Broadband Britain Umbilical Services Structure 3 (B-BUSS3) Product Specification

B-BUSS3 Specification

Broadband Britain Umbilical Services Structure 7 (B-BUSS7) Product Specification

B-BUSS7 Specification

Product Design Drawing for B-BUSS (large file 1.7Mb) B-BUSS Drawing

Low Capacity Unit (LCU) Specification

LCU Specification

Product Design Drawings for LCU (large file 1.5Mb) LCU Drawing

Medium Capacity Unit 1 (MCU1) Specification

MCU1 Specification

Medium Capacity Unit 2 (MCU2) Specification

MCU2 Specification

Product Design Drawings for MCU (large file 2.9Mb)
MCU Drawing

ASS600 Product Specification

ASS600 Product Specification

LLU Hostel Product Specification

Specification of the BT LLU Hostel Product.

The schematic from within this document (in Powerpoint format) is also available as a separate file here

Specification

Schematic

LLU Mini - Hostel Product Specification

This is a description and schematic of BT's Mini-Hostel product. Whilst retaining many of the design features of the LLU Hostel, it is designed to be cost effective where there are low levels of demand for physical Co-location , i.e. from one to four bays. The Mini Hostel supersedes the Hostel Optima proposals.

Download the specification of the BT LLU Hostel Product.

 

 

Specification